RESEARCH PROJECTS
PLANNING
Abnormal event traffic forecasting
(Smith)
Final report
Description
Asset management
(Gifford)
Final report
Description
Automated identification of traffic patterns
(Smith)
Description
Disparate transportation data integration
(Scherer)
Final report
Description
Emissions measurement
(Rakha)
Final report
Description
Emissions modeling
(Rakha)
Final report
Description
Fleet Forward traffic forecasting
(Smith)
Final report
Description
I-77/I-81 diversion modeling
(Rakha)
Final report
Description
IDAS as a prioritizing tool
(Park)
Final report
Description
ITS infrastructure maintenance management
(Teng
)
Final report
Description
Identification of traffic patterns leading to crashes
(Garber))
Final report
Description
Incident capacity estimation
(Smith)
Final report
Description
Incident duration forecasting
(Smith; cont' Fleet Forward)
Final report
Description
Modeling of vehicle crash causes
(Garber)
Final report
Description
Naturalistic driving study: phase 2
(Neale)
Final report
Description
Optimization of coordinated actuated signal timing
(Park)
Final report
Description
Regional pedestrian activity measurement
(Schroeder)
Final report
Description
Road pricing
(Button)
Final report
Description
Rubbernecking impact of incidents
(Teng)
Final report
Description
Speed/headway influence on crashes
(Park)
Description
Telework
(Stough)
Final report
Description
Traffic forecasting: non-parametric regressions
(Scherer)
Final report
Description
VMT estimation based on ITS data
(Teng)
Final report
Description
Wireless testing protocols
(Schroeder)
Final report
Description
OPERATIONS
511 Virginia Email Alert System
(Schroeder)
Final report
Description
Accident management using wireless networks
(Scherer)
Final report
Description
Adaptive signals decision support system
(Smith)
Final report
Description
Cellphone probes as an ATMS tool
(Smith)
Final report
Description
Dynamic roadway travel time estimation
(Rakha)
Description
I-81 tolling options
(Rakha)
Final report
Description
I-81 video systems
(Schroeder)
Final report
Description
Integrating transit signal priority and adaptive traffic signal control
(Rakha)
Final report
Description
Intelligent Vehicle Initiative
vehicles
(Dingus)
Final report
Description
Low-cost adaptive signals
(Scherer)
Final report
Description
N11
(Stough)
Final report
Description
Northern Shenandoah human services
(Smith)
Final report
Description
Parking management
(Rakha)
Final report
Description
Route 460 wireless network
(Schroeder)
Final report
Description
Signal prioritization
(Collura)
Final report
Description
Signal system data mining
(Smith)
Final report
Description
Signal timing algorithm
(Park)
Final report
Description
Transportation data clearinghouse
(Schroeder)
Final report
Description
Transportation infrastructure security monitoring
(Scherer)
Final report
Description
Travel Virginia
(Schroeder)
Final report
Description
Truck stop information
(Garber)
Final report
Description
VDOT surveillance needs
(Rakha)
Final report
Description
Wet weather signalization
(Demetsky
)
Final report
Description
EVALUATION
Application of U.S. DOT evaluation guidelines
(Demetsky)
Final report
Description
Call box evaluation
(Button)
Final report
Description
CapWIN evaluation
(Smith)
Final report
Description
Cost-benefit analysis for ITS: CORSIM
(Scherer)
Final report
Description
DynaMIT evaluation
(Park)
Final report
Description
Evaluation of advanced traffic signal controllers
(Park)
F
inal report
Description
Hampton Roads ATIS
(Demetsky)
F
inal report
Description
Hampton Roads simulation
(Park)
F
inal report
Description
I-66 Integration model
(Schintler)
Final report
Description
Sensor evaluation
(Smith)
Final report
Description
Vehicle instrumentation to test ITS
(Hankey)
Final report
Description
Weigh-in-motion evaluation
(Rakha)
Final report
Description